A CNC spindle drives a carbide end mill into a block of aluminum, chips curling away and coolant mist rising around the tool.
Marek on the production floor with a team member

15 years in sheet metal.
All of it on the floor.

I led a lean transformation that cut production lead time from 11 days to an estimated 48 hours for around 90% of orders. We reduced WIP and finished goods inventory, taking the production footprint from 39,000 to 15,000 sq ft, then to 9,000 about 6 months later. The final redesign had a $15k capital budget, with $60k in annual labor savings and $200k in cash released.


At Stratus, I built the Fab1 cell around a clear path from material preparation through welding and assembly to paint. In Fab3, I split complex builds across 4 stations with mixed-skill teams. Less experienced fabricators took on defined modules while an experienced technician coordinated the work. Most lead times fell by about half, measured from job records. Transferring tribal knowledge took longer, and that work was still ongoing.

How it works

Build a system your team can run.

Start with the real bottleneck, turn insight into standard work and keep the structure running every day.

  • observe
  • ask why
  • find root cause
  • fix system
  • sustain

01

Diagnose

Find what is actually breaking flow

Map the real process. Separate the bottlenecks from the symptoms.

02

Design

Build standard work that people can follow

Clear handoffs, visible decisions and routines written down where the team can see them.

03

Stabilize

Make the operation run on structure

A system that holds under daily pressure, so the shift runs on routine.

Marek on the production floor

Start here

Start with one
bottleneck.

Where is flow breaking in your operation right now? That is the question. Everything else follows from there.

One practical conversation and one realistic first step.

Marek

I read every message myself and reply within one working day.